Tile · CA
Tile cost in Sacramento-Roseville-Folsom, CA
Planning ranges for tile work in Sacramento-Roseville-Folsom, CA, built from BLS OEWS May 2025 wages (SOC 47-2044) plus our published hours and materials. Open any job row to run it on your ZIP.
Last updated from data: BLS OEWS May 2025 · PPI construction materials 2026-09 · estimates only
How this market compares
If you are pricing Tile work in Sacramento-Roseville-Folsom, the wage file is the honest place to start. Mean hourly pay here sits about 1% above the national OEWS mean.
Among 141 OEWS areas with published Tile wages, Sacramento-Roseville-Folsom ranks #42 nationally on mean hourly pay ($28.78). Compared with other CA areas that report Tile wages, this market is #10 of 18. Percentile spread: $18.28–$43.54. Median sits at $27.04.
Local employment for this SOC is roughly 790 workers (OEWS May 2025). Nationwide that occupation is about 35,850. How a few common projects pencil out against the national mid: Tile Flooring Installation mid estimate $1,725 here vs $1,710 U.S. (1% above); Bathroom Tub/Shower Tile Surround mid estimate $1,846 here vs $1,832 U.S. (1% above).
Nearby / same-state markets worth checking: Stockton-Lodi (about the same, $28.74); Santa Maria-Santa Barbara ($28.58, 0.20 lower); Riverside-San Bernardino-Ontario ($29.11, 0.33 higher).
Local tip: Local code, permit fees, and how busy crews are this month move numbers as much as wage rates do.
Sample project ranges
| Project | Low | Mid | High |
|---|---|---|---|
| Tile Flooring Installation (default size) (calc) | $699 | $1,725 | $4,955 |
| Bathroom Tub/Shower Tile Surround (calc) | $689 | $1,846 | $4,685 |
What usually moves the number
- Scope surprises: duct repairs, panel upgrades, extra roof layers.
- How booked local crews are this season.
- Materials choices — we only nudge materials with a dampened regional factor. See methodology.
Rebates (verify; don’t trust a random Facebook ad)
Check IRS, ENERGY STAR, and DSIRE for any incentives that apply to this project. Start with IRS, ENERGY STAR, and DSIRE.
Getting quotes without the circus
- Screenshot our mid/low/high band.
- Ask three licensed, insured pros for written scopes.
- Compare exclusions — permits, haul-away, thermostats, flashing — before crowning a winner.
Tile cost FAQ — Sacramento-Roseville-Folsom
How much does tile cost in Sacramento-Roseville-Folsom?
We combine OEWS wages for Tile and Stone Setters with published hours and materials assumptions for jobs like tile flooring installation, bathroom tub/shower tile surround. Treat the table as a planning band, then collect written bids.
Where do the wages come from?
BLS OEWS May 2025 — mean $28.78, median $27.04, p10–p90 $18.28–$43.54 (SOC 47-2044).
Is this a contractor quote?
No. Fairange publishes educational planning ranges. Markup is 2.0× / 2.25× / 2.5× on labor; materials use cited retail baselines with a dampened regional factor. See methodology.
Why might this look like a national average?
OEWS publishes Tile and Stone Setters wages in relatively few areas. If your ZIP has no local cell, Fairange uses the U.S. mean and labels it.
Job guides: Tile Flooring Installation · Bathroom Tub/Shower Tile Surround. Reports: repair labor by metro. Open calculator with your ZIP.
Check our math
BLS OEWS May 2025 · local hourly means the calculator uses
| Tile (47-2044) | $28.78/hr mean |
Source: official BLS OEWS data for this area · area index: oessrcma.htm.
Contractor markup (2.0× / 2.25× / 2.5×) and the regional materials factor are ours — see methodology.
Paid listing for Sacramento-Roseville-Folsom, CA Tile. Partner.
Want actual bids?
Leave a few details if you’d like local pros to follow up. We’ll only share what you submit after you check the box below.
Affiliate link
Gear people often ask about
We’re not a store. These spots are for partner recommendations — clearly labeled. We may earn a commission if you buy through a link here.
A decent thermostat won’t fix a bad install, but it can stop the short-cycling arguments.
Partner options Affiliate linkTank, tankless, heat-pump — the sticker price is only half the story.
Partner options Affiliate linkRead the exclusions. “Full coverage” rarely means what the brochure implies.
Partner options Affiliate linkMonthly wage & cost note
Short email when we refresh the index. No daily drip campaign. Unsubscribe whenever.