Tile · SOC 47-2044

Bathroom Tub/Shower Tile Surround cost

Shower tile surround — that’s the everyday name. On Fairange it’s a published hours band (12/20/32) plus a materials band, run through BLS OEWS May 2025 wages for Tile and Stone Setters (SOC 47-2044).

Looking up bathroom tub/shower tile surround cost? Start here: national mid planning estimate $1,832 before you type a ZIP, built from OEWS 47-2044 wages and the assumptions below — not lead-gen marketplace price tables.

Last updated from data: BLS OEWS May 2025 · PPI construction materials 2026-09

What this estimate can’t tell you. Roof pitch, an old house or code upgrades, tough access, permits, emergency or after-hours calls, and brand tier can push a real quote outside this range.
Hours (low / mid / high)
12 / 20 / 32
Materials band
$250 – $1,200
U.S. mid (before ZIP)
$1,832

tile three-wall tub surround ≈60–80 sq ft including thinset/grout; waterproofing membrane mid/high. National OEWS mean wage used on this page: $28.49/hr (SOC 47-2044).

How the national mid is built

Before you enter a ZIP we use the U.S. OEWS mean wage for Tile and Stone Setters (SOC 47-2044): $28.49/hr (BLS OEWS May 2025). Mid estimate ≈ 20 hours × $28.49 × 2.25× markup + materials mid $550 (with a small regional materials factor). Low uses p10 wages × 2.0×; high uses p90 × 2.5×. National planning band: $679 – $1,832 – $4,512.

Full algebra: methodology. Markup schedule is Fairange’s published assumption, not a BLS figure.

Materials band

Published materials low / mid / high: $250 / $550 / $1,200 (tile three-wall tub surround ≈60–80 sq ft including thinset/grout; waterproofing membrane mid/high). Baselines are Fairange editorial figures tied to public retail when we have a SKU basket; full source notes live in DATA_SOURCES and the methodology page. We dampen materials with a regional factor (about 0.88–1.18) so wages — not a fake local parts market — do most of the geography.

What usually moves the number

What’s in the planning band

Labor in the published hours band plus the materials band above.

Ask about before you sign

Run this job on your ZIP Tile trade hub

Related jobs: Shower Faucet / Trim Replacement.

Also: calculator · methodology · city guides · all job guides · DATA_SOURCES.

Bathroom Tub/Shower Tile Surround FAQ

How much does bathroom tub/shower tile surround cost?

National mid planning estimate is about $1,832 before you enter a ZIP — labor from BLS OEWS May 2025 Tile and Stone Setters (SOC 47-2044, national mean $28.49/hr) × published hours, plus materials. Local OEWS wages move the band once you type a ZIP.

What hours, materials, and markup do you assume?

Hours 12 / 20 / 32. Materials band $250 / $550 / $1,200 (tile three-wall tub surround ≈60–80 sq ft including thinset/grout; waterproofing membrane mid/high), documented in DATA_SOURCES / methodology — not lead-gen marketplace price tables. Labor markup 2.0× / 2.25× / 2.5× (Fairange methodology).

Is this a bid?

No. It’s an educational planning range. Collect at least three written scopes from licensed pros and compare exclusions — permits, haul-away, patching, and code upgrades.

Any rebates or tax credits?

Check IRS, ENERGY STAR, and DSIRE for any incentives that apply to this project.

Want actual bids?

Leave a few details if you’d like local pros to follow up. We’ll only share what you submit after you check the box below.