Concrete · CO

Concrete cost in Denver-Aurora-Centennial, CO

Planning ranges for concrete work in Denver-Aurora-Centennial, CO, built from BLS OEWS May 2025 wages (SOC 47-2051) plus our published hours and materials. Open any job row to run it on your ZIP.

Last updated from data: BLS OEWS May 2025 · PPI construction materials 2026-09 · estimates only

Mean hourly wage
$29.56
Median hourly
$29.87
p10 – p90
$22.33 – $36.05

How this market compares

If you are pricing Concrete work in Denver-Aurora-Centennial, the wage file is the honest place to start. Mean hourly pay here sits about 2% above the national OEWS mean.

Among 457 OEWS areas with published Concrete wages, Denver-Aurora-Centennial ranks #142 nationally on mean hourly pay ($29.56). Inside CO, that is rank 3 of 10 published areas. The published p10–p90 band runs $22.33 to $36.05 (a $13.72 spread around the $29.56 mean; median $29.87).

OEWS counts about 2,590 Cement Masons and Concrete Finishers jobs in this area. Nationwide that occupation is about 206,170. Sample jobs: Concrete Patio Slab mid estimate $1,852 here vs $1,819 U.S. (2% above); Concrete Driveway (section) mid estimate $4,477 here vs $4,398 U.S. (2% above).

Same-state comparison: Boulder ($28.86, 0.70 lower); Fort Collins-Loveland ($28.12, 1.44 lower); Colorado Springs ($28.00, 1.56 lower).

Sample project ranges

ProjectLowMidHigh
Concrete Patio Slab (default size) (calc)$897$1,852$3,687
Concrete Driveway (section) (default size) (calc)$2,312$4,477$9,217

Rebates (verify; don’t trust a random Facebook ad)

Check IRS, ENERGY STAR, and DSIRE for any incentives that apply to this project. Start with IRS, ENERGY STAR, and DSIRE.

Local tip: Local code, permit fees, and how busy crews are this month move numbers as much as wage rates do.

What usually moves the number

Getting quotes without the circus

  1. Screenshot our mid/low/high band.
  2. Ask three licensed, insured pros for written scopes.
  3. Compare exclusions — permits, haul-away, thermostats, flashing — before crowning a winner.

Concrete cost FAQ — Denver-Aurora-Centennial

How much does concrete cost in Denver-Aurora-Centennial?

We combine OEWS wages for Cement Masons and Concrete Finishers with published hours and materials assumptions for jobs like concrete patio slab, concrete driveway (section). Treat the table as a planning band, then collect written bids.

Where do the wages come from?

BLS OEWS May 2025 — mean $29.56, median $29.87, p10–p90 $22.33–$36.05 (SOC 47-2051).

Is this a contractor quote?

No. Fairange publishes educational planning ranges. Markup is 2.0× / 2.25× / 2.5× on labor; materials use cited retail baselines with a dampened regional factor. See methodology.

Job guides: Concrete Patio Slab · Concrete Driveway (section). Reports: repair labor by metro. Open calculator with your ZIP.

What this estimate can’t tell you. Roof pitch, an old house or code upgrades, tough access, permits, emergency or after-hours calls, and brand tier can push a real quote outside this range.

Check our math

BLS OEWS May 2025 · local hourly means the calculator uses

Concrete (47-2051)$29.56/hr mean

Source: official BLS OEWS data for this area · area index: oessrcma.htm.

Contractor markup (2.0× / 2.25× / 2.5×) and the regional materials factor are ours — see methodology.

Local pro? Get featured in Denver-Aurora-Centennial, CO — talk to us.
Featured local pro

Paid listing for Denver-Aurora-Centennial, CO Concrete. Partner.

Want actual bids?

Leave a few details if you’d like local pros to follow up. We’ll only share what you submit after you check the box below.

Gear people often ask about

We’re not a store. These spots are for partner recommendations — clearly labeled. We may earn a commission if you buy through a link here.

Thermostats

A decent thermostat won’t fix a bad install, but it can stop the short-cycling arguments.

Partner options
Water heaters

Tank, tankless, heat-pump — the sticker price is only half the story.

Partner options
Warranties & financing

Read the exclusions. “Full coverage” rarely means what the brochure implies.

Partner options

Monthly wage & cost note

Short email when we refresh the index. No daily drip campaign. Unsubscribe whenever.