Plumbing · SOC 47-2152

Toilet Installation cost

Looking up toilet installation cost? Start here: national mid planning estimate $475 before you type a ZIP, built from OEWS 47-2152 wages and the assumptions below — not lead-gen marketplace price tables.

Plumbing estimates swing on access, fixture grade, and whether the valve or flange is still good. For Toilet Installation we use mid hours of 2.5 and materials around $280, then apply the same 2.0× / 2.25× / 2.5× labor markup schedule as every other Fairange job.

Last updated from data: BLS OEWS May 2025 · PPI construction materials 2026-09

What this estimate can’t tell you. Roof pitch, an old house or code upgrades, tough access, permits, emergency or after-hours calls, and brand tier can push a real quote outside this range.
Hours (low / mid / high)
1.5 / 2.5 / 4
Materials band
$120 – $550
U.S. mid (before ZIP)
$475

remove old, install new standard toilet. National OEWS mean wage used on this page: $34.70/hr (SOC 47-2152).

How the national mid is built

Before you enter a ZIP we use the U.S. OEWS mean wage for Plumbers, Pipefitters, and Steamfitters (SOC 47-2152): $34.70/hr (BLS OEWS May 2025). Mid estimate ≈ 2.5 hours × $34.70 × 2.25× markup + materials mid $280 (with a small regional materials factor). Low uses p10 wages × 2.0×; high uses p90 × 2.5×. National planning band: $184 – $475 – $1,071.

Full algebra: methodology. Markup schedule is Fairange’s published assumption, not a BLS figure.

Materials band

Published materials low / mid / high: $120 / $280 / $550 (remove old, install new standard toilet). Baselines are Fairange editorial figures tied to public retail when we have a SKU basket; full source notes live in DATA_SOURCES and the methodology page. We dampen materials with a regional factor (about 0.88–1.18) so wages — not a fake local parts market — do most of the geography.

What usually moves the number

What’s in the planning band

Labor for a standard residential swap or service, supply/drain reconnect in place, and the fixture/parts band above.

Ask about before you sign

Run this job on your ZIP Plumbing trade hub

Related jobs: Shower Faucet / Trim Replacement · Kitchen Faucet Replacement · Bathroom Faucet Replacement.

Also: calculator · methodology · city guides · metro ranking report · all job guides · DATA_SOURCES.

Toilet Installation FAQ

How much does toilet installation cost?

National mid planning estimate is about $475 before you enter a ZIP — labor from BLS OEWS May 2025 Plumbers, Pipefitters, and Steamfitters (SOC 47-2152, national mean $34.70/hr) × published hours, plus materials. Local OEWS wages move the band once you type a ZIP.

What hours, materials, and markup do you assume?

Hours 1.5 / 2.5 / 4. Materials band $120 / $280 / $550 (remove old, install new standard toilet), documented in DATA_SOURCES / methodology — not lead-gen marketplace price tables. Labor markup 2.0× / 2.25× / 2.5× (Fairange methodology).

Is this a bid?

No. It’s an educational planning range. Collect at least three written scopes from licensed pros and compare exclusions — permits, haul-away, patching, and code upgrades.

Any rebates or tax credits?

Some water utilities offer rebates for WaterSense high-efficiency toilets—check your local utility.

Where does this job cost the most?

See our metro ranking built on the same job assumptions: /reports/toilet-install-cost-by-metro/ (OEWS local wages, same hours/materials/markup).

Want actual bids?

Leave a few details if you’d like local pros to follow up. We’ll only share what you submit after you check the box below.